Cryptic crossword clue
Sheltered home’s behind schedule in the south of France 9

The most common and most likely answer to this crossword clue is the 9 letter word INSULATED

I
N
S
U
L
A
T
E
D


Buddy explains!

The cryptic/wordplay part
In cryptic crossword there's often an wordplay/cryptic part as well.
This part involves a more complex hint, such as an anagram, homophone, hidden word, etc.
Sadly, We don't have an explanation for this specific crossword clue yet.

What does INSULATED mean?

INSULATED verb
  1. To separate, detach, or isolate.
  2. To separate a body or material from others, e.g. by non-conductors to prevent the transfer of electricity, heat, etc.
INSULATED adjective
  1. Protected from heat, cold, noise etc, by being surrounded with an insulating material.
  2. Placed or set apart.
  3. (of an electrically conducting material) Isolated or separated from other conducting materials, or sources of electricity.
  4. Situated at so great a distance as to be beyond the effect of gravitation; said of stars supposed to be so far apart that the effect of their mutual attraction is undetectable.

Latest crossword clues with full explanations