Cryptic crossword clue
Turner is behind schedule entering hotel 5

The most common and most likely answer to this crossword clue is the 5 letter word LATHE

I've seen this crossword clue in Financial Times
L
A
T
H
E


Buddy explains!

The straight part
We know that "Turner" is the straight/definition part of the clue. The straight part is often a synonym or definition, in this case turner = lathe.
The cryptic/wordplay part
In cryptic crossword there's often an wordplay/cryptic part as well.
This part involves a more complex hint, such as an anagram, homophone, hidden word, etc.
Sadly, We don't have an explanation for this specific crossword clue yet.

What does LATHE mean?

LATHE verb
  1. To invite; bid; ask.
LATHE noun
  1. An administrative division of the county of Kent, in England, from the Anglo-Saxon period until it fell entirely out of use in the early twentieth century.
LATHE noun
  1. A machine tool used to shape a piece of material, or workpiece, by rotating the workpiece against a cutting tool.
  2. The movable swing frame of a loom, carrying the reed for separating the warp threads and beating up the weft; a lay, or batten.
  3. A granary; a barn.
LATHE verb
  1. To shape with a lathe.
  2. To produce a three-dimensional model by rotating a set of points around a fixed axis.

Latest crossword clues with full explanations